Abadan Power Plant

Having started to be constructed in 2002, this power plant was delivered to the Turkmenistan Ministry of Energy in 2003. Abadan Power Plant, which has a power generation capacity of 123 megawatts, meets a significant portion of the national energy need.

Employer Turkmenistan Ministry of Energy
Location Turkmenistan
Start Date 11/1/2002
End Date 10/27/2013