Construction Period: 4/2012 - 4/2014
230 bed capacity (200 in Ashgabad and 30 in other provinces)
The largest emergency hospital in the country
Design in line with international standards and SNT requirements
Incorporates state of the art medical equipment and technological advancement in all facilities
38.500 sq.m of construction area