Construction Period: 11/2015 - 7/2017
120 bed capacity in Endocrinology and 180 bed capacity in Surgical Center
18 Operating Theatres, 28 Intensive Care Units and many laboratories
Design in line with international standards and SNT requirements
Incorporates state of the art medical equipment and technological advancement in all facilities
54.000 sq.m of construction area