Having started to be built in September 2005 in Turkmenistan’s Kıyanly region, Petronas Carigali Power Plant was completed in September 2007 following a construction period of two years and delivered to the Turkmenistan Ministry of Energy. The power plant, which plays an essential role in Turkmenistan’s petroleum and energy need, makes the country more powerful in the international arena with its power generation capacity.
Employer
MMHE Technip Joint Venture
Location
Kıyanly - Turkmenistan
Start Date
1/14/2005
End Date
12/31/2007