Construction Period: 42 months
500 beds capacity
14 Operating Theatres, 45 Intensive Care Units
Design in line with international standards and SNT requirements
Incorporates state of the art medical equipment and technological advancement in all facilities
Main Medical Equipment List has been prepared in cooperation with end-user doctors
91 065 sq.m of construction area