Iraq Basra Port Rehabilitation & Extension Project


In the Iraq Basra Port Extension Project, 3 types of quay structures are being built in 2 different locations where are the Khor-Al-Zubair Harbor and the Umm-Qasr Port.

The building on the first site within the Khor-Al-Zubair Harbor; It is a 340 m long and 20 m wide fuel filling structure that will allow ships of 60,000 and 10,000 DWT to dock. The planned depth of the building is 12.5 m. The foundation of the structure is steel pipe piles with a diameter of 700 mm and a length of 30 m. superstructure consists of reinforced concrete deck. The connection of this structure with the land is provided by 2 prestressed reinforced concrete bridges of 37m length. All construction activities are carried out from the sea.

At the second site near the Umm-Qasr Port, a 250 m long dock is being built for dredging ships to dock. The planned depth of the building is 9 m. This structure is created by filling the closed sea area with 180,000 m3 sand, which will be formed by fixing the 30 m long H profile sheet piles to the anchor pipe piles of 1100 diameter and 20 m long anchor pipe piles with special steel ropes. Right next to this structure, there is another docking pier consisting of 5 pieces of dolphins with a steel pipe pile foundation.

Supply and installation of all accessories and electrical and mechanical infrastructure works on the quay; Turnkey construction of the administrative buildings in the back field is also within the scope of the project.
Employer

Location
Iraq
Start Date
05/29/2018
End Date
01/29/2023